Bharat Petroleum Corp will shut its 120,000 barrels-per-day (Mbpd) joint venture Bina refinery from mid-August for 45 days, a month ahead of the previous plan after a minor fire at the delayed coker, two sources said on Monday. The refiner has shut the delayed coker after a fire during the weekend and has decided to advance the September shutdown.
During the 45-day shutdown, BPCL will carry out modifications at various units to raise the capacity of the plant to 156 Mbpd. The Bina refinery is operated by Bharat Oman Refineries Ltd (BORL), a 50-50 joint venture between Oman Oil Co and state-run BPCL.