Taiwan based China Development Chemical Corp has reached its on-spec production at its unti which was restarted recently. On Unit has the production capacity of 100,000 tonne/ year caprolactam . Unit is locatec at Toufen in Taiwan. The caprolactam line, which had been idle since 2012, was restarted in endJune. CPDC currently has three caprolactam lines – one in Xiaogang with a 200,000 tonnes/year production capacity and two lines in Toufen, each with a 100,000 tonne/year.